imag007.jpg
- Page 3 -
- Page 3 -
"INSTRUMENTATION WITH QUALITY ENGINEERING"
solare2003010.jpg
E2 Set Point is an excellent companion to the differential controllers for space heating applications. It is also intended for use as a HI/LO LIMIT ALARM in SUPERVISORY CIRCUIT APPLICATIONS.
EAGLE 2 SETPOINT CONTROLLER
PR# HVAC-2 ESC-10
Bolt-on style: SOLR-TS02
Immersion style: SOLR-TS04 4" or 8" long with 1/4 or 1/2-NPT fitting
TEMPERATURE PROBES:
THERMISTOR TEMPERATURE SENSORS RATED TO 400 deg. F:
EAGLE 2 Dual Relay TWO ZONE controllers with SELECTABLE programs are designed specifically for controlling pressurized systems with heat dump cycles such as evacuated tube collectors or additional supplemental infloor space heating and much more.  
 
 
PLEASE VISIT for other temperature controls with alarms and thermometers for use in food production and other industial/commercial applications.
www.imcinstruments.com
sales@imcinstruments.com
solar_support@imcinstruments.com
EAGLE INDOOR POOL CONTROLLER
MADE IN U.S.A.
INSTRUMENTS, INC.
MANUFACTURES AN OUTSTANDING
LINE OF DIFFERENTIAL & SETPOINT CONTROLLERS FOR SOLAR HEATING
flagus.gif
> Next Page >
< Previous Page <
< Previous Page <
> Next Page >
solare2003005.jpg
PR# E2C1-1000
E2 POOL controllers offers 1.5F POOL SETPOINT accuracy along with differential temperature control for SOLAR PANEL operation. It also includes a SYSTEM STATUS DISPLAY for complete system operation
Click product image
for more information
Click here to go to master product download pg4
10K THERMISTOR
Resistance-Temperature  TABLE - click here
GROUNDS and SHIELDS INSTRUCTIONS
click here
PR# E2W1-2020-PR
Screw-in style: SOLR-TS031/2-NPT threaded plug
PRECISION MATCHED +/0.15F  for ENERGY METER applications. Immersion style: SOLR-TS14 4" or 8" long with 1/4 or 1/2-NPT fitting
The wiring of POWER GROUNDS and SENSOR SHIELDS is EXTREMELY important. Lightening from electrical storms can introduce very damaging voltage transients into the power and sensor wiring. In order to protect the Eagle 2 controller, Shields and ground terminals have to be wired properly. Please click above to DOWNLOAD wiring instructions.